August 12th, 2008 by Ryan
We are in the final stretch and have an estimated 3 weeks to completion. The wood floors are in and just need to be stained. The tile is finished in the kitchen and both bathrooms as well. The kitchen should be entirely done by Wednesday (8/13). There is one more day of painting which we will do this coming Saturday. There are a few 2nd coats left and all the master bedroom/bathroom still needs to be painted. Brandon and Bob have started the deck and the ceiling of the master bedroom, which will be tongue and groove wood.
Posted in Uncategorized
July 1st, 2008 by Ryan
There is new paint on the house with the trim still yet to be done. Roofers were there yesterday putting on shingles. There is one last inspection that we must pass before we can do insulation and drywall on the inside. Sorry about the lull in posts, but hopefully you’ve been able to follow our progress by the photos.
Ginny added a new PLANS tab on the top that shows the old and new floorplans, which were done by Nicole Durkin. I will have Brandon post about the past few weeks since he will be able to give more insight. Once the Tyvek and siding went up, it’s been smaller and more behind the scenes work at 1903.
Posted in Uncategorized
June 7th, 2008 by Ryan
The plumbing is in and all the framing is complete. The windows and doors were delivered on Thursday from Marvin Windows. Brandon and Bob put in new 2 x 8’s in the ceiling over the living room since the load bearing supports below that were removed. This is where the kitchen table used to be (see Gallery from March 25 and May 13). I believe the electrician will be by early next week to do his thing.
Posted in Uncategorized
June 2nd, 2008 by Ryan
As of Sunday, almost all of the framing was done. There are a few things left to do for the roofing portion, but other than that it looks good. It’s really gratifying to see the actual space and size of the new kitchen and master bedroom after looking at a floor plan for the past month. The master suite will have vaulted ceilings, 3 windows (2 facing east, 1 facing south), and French doors which will let in plenty of light, but the overhanging trees will still provide adequate shade.
We should have renderings up by the end of this week to show what the finished product will look like.
Posted in Uncategorized
May 22nd, 2008 by Ryan
Brandon can shed more light on this since he is currently on-site, but today the rest of the piers were poured. Yesterday the base/re-barb were put in and today the above ground portion of the piers are going up. It was overcast all day today with only very minor sprinkles of rain, so there were no delays, but we are hoping for some heavy sun so the concrete can complete drying and framing can begin on Saturday.
We will be at the property all day Saturday and Sunday (weather pending) so if you want to come see our progress or lend a hand please stop on by 
Posted in Uncategorized